Bathroom #1 (basement 1/2 bath) before... BORING!
The epic mess. We bought cabinets, fixtures, etc for all three at once.
Painting. I can't squeeze into these little spaces right now!
Bathroom #1 after!
Bathroom #2 (upstairs full bath, ie guest bath and baby bath) Before... wallpaper, anyone?
The lovely cabinet, light and mirror.
Bathroom #2, done! Although I do have different towels in there now, you get the idea. Picture this with deep orange towels instead. :)
A much need improvement!

The epic mess. We bought cabinets, fixtures, etc for all three at once.
Painting. I can't squeeze into these little spaces right now!
Bathroom #1 after!
Bathroom #2 (upstairs full bath, ie guest bath and baby bath) Before... wallpaper, anyone?
The lovely cabinet, light and mirror.
Bathroom #2, done! Although I do have different towels in there now, you get the idea. Picture this with deep orange towels instead. :)
A much need improvement!
After these two were finished, and the demo on bathroom #3 complete (more pics of this one to come), we headed off to Alaska for a baby shower/much needed break. I didn't include pictures but Joel also replaced the shower hardware, which consisted of opening up the wall on the other side of the shower and doing some major plumbing work! Check out our flickr site for the whole story.
No comments:
Post a Comment